Unexploded ordnance
Glossary of common terms used in the management of land contamination, published on the Planning Portal, defines an unexploded ordnance (UXO) as an: ‘…explosive ordnance that has been either primed, fused, armed or prepared for use and has been subsequently fired, dropped, launched, projected or placed in such a manner as to present a hazard to operations, persons or objects and remains unexploded either by malfunction or design.’
Unexploded ordnances are a significant concern for construction projects in the UK, especially in areas with historical ties to military activities, such as those bombed during World War II. Many areas in the UK, especially cities like London, Manchester, and Coventry, were heavily bombed during WWII and unexploded bombs and munitions are frequently found in these regions. Historical military training sites and ordnance manufacturing facilities are also potential hotspots for UXOs.
Addressing UXOs is critical for safety, regulatory compliance, project efficiency, and cost management. UXOs pose a direct threat to life and property. If disturbed during excavation or piling, these devices can detonate, causing injury, fatalities, or substantial property damage. Construction workers and the surrounding public are at risk, making UXO identification and mitigation a significant safety priority.
UXO risk assessments are often part of pre-construction surveys in high-risk areas. Conducting these surveys helps to avoid surprises and integrate risk mitigation measures into project planning. The possible presence of UXOs may influence decisions on excavation methods, site layout, and even project timelines.
Discovering a UXO mid-project can halt construction, causing significant delays. Specialist UXO surveys and removal services are required, which can add unplanned costs. However, If not addressed proactively, the costs of dealing with a UXO incident far exceed those of preventative measures. Health and safety regulations in the UK, such as the Health and Safety at Work Act 1974, require employers to identify and mitigate risks, including UXOs. Ignoring UXO risks can lead to legal penalties and liabilities if an incident occurs.
An unintended detonation can have wider consequences, including damage to nearby properties and disruption to local communities. Environmental considerations also come into play, as the chemicals from UXOs could contaminate soil and water.
[edit] To manage UXO risks, it may be necessary to undertake:
- Historical risk assessments, reviewing bombing records, military maps, and historical data to assess the likelihood of UXOs on a site.
- Geophysical surveys using magnetometers and other technologies to detect metal anomalies underground.
- Engaging UXO experts to identify, assess, and safely remove or neutralise ordnances.
[edit] Related articles on Designing Buildings
Featured articles and news
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.